Guangzhou Tabard Fire-Proof Materials Co. Ltd. / Guangzhou Tabard Special Coating Engineering Co. Ltd. 

Details

Home  > PRODUCTS  > Anti-corrosion coatings > Primer > Details
HF-12 Epoxy Rusty Primer
  • HF-12 Epoxy Rusty Primer
  • Specifications
    • Product Name:HF-12 Epoxy Rusty Primer
    • Product Number:HF-12
    • 分享到:
  • Details
  • Product Description

    It is composed by epoxy resin, active antirust pigment, organic chlorine-alkali, permeating agent, curing agent and promoter, etc. Packaging is divided into Component A and Component B. The coating can generate complex with iron and therefore it has good function of stabilizing corrosion and persistent antirust effect. The coating has good adaptability on surfaces of rusty or rust-free steel; the mechanical property and adhesion of the film are excellent.


    Design Purpose

    It is can be directly apply to the rusty steel surface (rusty scale is under 60μm) and simple corrosion resistance for rust-free steel surface.


    Physical Parameters

    Color:

    Rusty red

     

    Theoretical spreading rate

    125g/m2, 11.40m2/L (calculated by 40μm dryfilm, excluding loss)

     

    Specific gravity:

    About 1.40

     

    Drying time

    23±2℃: surface dry : 4h, hard dry: 24h

     

    Entirely cured

    23±2℃: 7d.

     

    Flash point

    Component A: 25℃; Component B: 20℃

     

    Storage period

    12 months

    Construction Instruction

    Mixing ratio

    Component A (paint): Component B (curing agent)=24:4


    Maturing time

    23±2℃: 30min


    Service life

    23±2℃: 6h


    Construction method

    High pressure siphon spray, air spray, manual brushing, roller painting.


    Diluent

    Diluent for X-7 epoxy coating


    The largest amount of dilution

    ≤5%


    Spray orifice

    20P20


    Spray pressure

    195kg/m2 (Spray information is for reference only, adjustment can be made when in actual use.)


    Tool washing

    Diluent for X-7 epoxy coating.


    Film coating thickness

    Wet film: 90μm, dry film:50μm


    Coating interval

    25℃: minimum 24h, maximum 7d


    Surface treatment

    Surface of the steel shall be free of grease, floating dust, water mark and loose rust, simple rust removal shall be done for the rust scale with thickness no more than 60μm.


    Construction condition

    *The coating shall be fully stirred well before construction and mixed properly as per specified quality, and put into service after 30min rest.

    *Construction temperature had better be in range of 10-35℃, construction shall not be done when temperature is lower than 5℃, relative humidity shall be less than or equal to 85%.


    Finishing paint

    High chlorinated polyethylene iron red antirust paint, chlorosulfonated polyethylene micaceous iron antirust paint.

     

    Suggested number of coating

    Coat one pass, dry film reaches 30-50μm.

    Packing Specification

    Container of 20 liters can load Component A of 24kg, container of 5 liters can load Component B of 4kg.

    Considerations

    *Component A shall be stirred evenly before use and then fully stirred after mixing with Component B.

    *Ratio of curing shall be different accordingly because of different temperature. The specified requirements shall be followed in particular case.

    *Interval time between preceding and subsequent paints shall not be too long and exceed the longest coating interval time.

    Safety guide

    * Please pay attention to the security issues on the packaging. In addition, relevant national safety code or specified by the local government shall be followed.

    *Avoid inhaling solvent vapors and painting mist for long term, skin and eye may not contact with the product.

    *Forced ventilation shall be provided when applying the paint in confined spaces or stagnant air, although in good ventilation, protection tools shall be worn.

    Annotation

    *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it;

    *If above data is changed, the data is based on the latest instruction, without prior notification.

Tags: