Guangzhou Tabard Fire-Proof Materials Co. Ltd. / Guangzhou Tabard Special Coating Engineering Co. Ltd. 

Details

Home  > PRODUCTS  > Anti-corrosion coatings > Topcoat > Details
H-1 Epoxy Finish Coat (Two Components)
  • Specifications
    • Product Name:H-1 Epoxy Finish Coat (Two Components)
    • Product Number:H-1
    • 分享到:
  • Details
  • Product Description

    The paint takes epoxy resin as basic material and mixes with modified resin and amine adduct curing agent. The film has fine physical and mechanical properties and good performance in corrosion resistance and is good at moisture and heat resistance, salt and frog resistance, light and color protection and weather resistance.


    Design Purpose

    It is used as finish of ships, bridges and steel structures.


    Physical Parameters

    Color:

    Various color

     

    Luster

    Glossy

     

    Theoretical spreading rate

    120g/m2, 10.5-11.4m2/L (calculated by 50μm dry film, excluding loss)

     

    Specific gravity:

    About 1.26-1.37

     

    Drying time

    23±2℃:surface dry: 2h, hard dry: 24h

     

    Entirely cured

    23±2℃:7d

     

    Flash point

    27℃

     

    Storage period

    12 months for Component A, 6 months for Component B

    Construction Instruction

    Mixing ratio

    Component A: Component B=3:1


    Maturing time

    23±2℃:20min


    Service life

    23±2℃:8h


    Construction method

    High pressure siphon spray, manual brushing, roller spray.


    Diluent

    Special diluents for X-9 modified epoxy finish.


    The largest amount of dilution

    ≤5%


    Spray orifice

    0.46~0.53mm


    Spray pressure

    250kg/cm2 (spraying information are for reference only and can be adjusted when in practice).


    Tool washing

    Special diluents for X-9 epoxy finish


    Film coating thickness

    Wet film: 85μm, dry film: 50μm


    Coating interval

    Substrate temperature

    -10℃

    5℃

    20℃

    30℃

    Minimum

    48h

    24h

    6h

    4h

    Maximum

    3 months

     


    Surface treatment

    If the preceding paint has been contaminated, take proper measurements to remove grease, dust, and also diluent for the preceding paint can be used to scrub.


    Construction condition

    Temperature is in -10℃ - 35℃, relative humidity shall be less than or equal to 85%, surface temperature of the object to be painted shall greater than dew point above 3℃, construction shall be forbidden under the condition of rain, fog , snow and larger dust.

     

    Prior primer

    Zinc-rich epoxy primer, micaceous iron epoxy antirust paint, iron red epoxy antirust paint and so on.

     

    Maintenance period

    23±2℃:more than 7d.

    Packing Specification

    Container of 20 liters can load Component A of 18kg, container of 5 liters can load Component B of 2kg.

    Remarks

    Film thickness can be adjusted according to demands, however, that can correspondingly change spreading rate and affect drying time.

    Considerations

    *If coating time of the preceding paint is too long, when coating the sequent paint, roughen the surface with waterproof abrasive paper, paint the coating after clearing away the dust and dirt on the surface to assure the adhesion between layers;

    * Tools for construction shall be clean and dry, the coating shall not be mixed with water or other impurities, prepare the coating at the time of use, and the coating shall be used up in 8h.

    * Before entirely cured and dry, take protection measurements for the film to avoid the washing and trample from rains or other liquid.

    * Coatings shall be stored in a dry and ventilated place, kept away from heat source, and avoid direct sunshine and isolated from fire.

    Safety guide

    Please pay attention to the security issues on packaging. In addition, relevant Safety guide codes of nation or specified by the local government shall be followed. Avoid inhaling solvent vapors and spray mist for long term, skin and eye may not contact with the product.

    Forced ventilation shall be provided when applying the paint in confined spaces or stagnant air, although in good ventilation, protection tools shall be worn.

    Annotation

    *Above-said thickness of dry film and wet film refers to the index while implementing the high-pressure air-free spray;

    *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it;

    *If above data is changed, the data is based on the latest instruction, without prior notification.

Tags: