Guangzhou Tabard Fire-Proof Materials Co. Ltd. / Guangzhou Tabard Special Coating Engineering Co. Ltd. 

Details

Home  > PRODUCTS  > Anti-corrosion coatings > Specialty Coatings > Details
HL-3 Epoxy Asphalt Mortared Coating (Two Components)
  • HL-3 Epoxy Asphalt Mortared Coating (Two Components)
  • Specifications
    • Product Name:HL-3 Epoxy Asphalt Mortared Coating (Two Components)
    • Product Number:HL-3
    • 分享到:
  • Details
  • Product Description

    The two-component paint product is consisted of epoxy resin, coal asphalt, antirust pigment, thickener and polyamide curing agent. The products have the characteristics of waterproof property and rust protection, good chemical resistance and oil resistance, good adhesion, shock resistance and wear resistance; good protection of resistance of cathode.


    Design Purpose

    The product is used for anti-corrosion of the bottom of boats, ballast tank, crude oil tank, fuel oil tank, sewage tank, steel column of wharf, offshore oil drilling platform, hydraulic steel gate, steel support of mine, pipeline and etc, can also be used for the anti-corrosion of steel and concrete.


    Physical Parameters

    Color:

    Gray          Black

    Luster

    Semi-gloss

    Theoretical spreading rate

    270g/m2, 4.44m2/L (calculated by 125μm dry, excluding loss)

    Specific gravity:

    About 1.20

    Drying time

    Substrate temperature

    5℃

    20℃

    30℃

    Surface dryness

    8h

    4h

    2h

    Actual dryness

    48h

    24h

    16h

    Fully cured

    14d

    7d

    5d

    Flash point

    Tan:22℃   Black:21℃

    Storage period

    12 months

    Construction Instruction

    Mixing ratio

    Component A(paint):Component B(curing agent) =20:4

    Maturing time

    23 ±2℃:0.5-1h

    Service life

    23 ±2℃:8h

    Construction method

    High pressure siphon spray,air spray, manual spray, roller spray

    Diluent

    X-7 epoxy diluent

    Maximal dilution amount

    High pressure siphon spray<5%; air spray<10%; manual spray, roller spray<5%

    Spray orifice

    High pressure siphon spray0.4~0.5mm; air spray2.0~3.0mm

    Spray pressure

    High pressure siphon spray20~30Mpa; air spray0.3~0.4Mpa

    Tool washing

    X-7 epoxy diluent

    Film coating thickness

    Wet film225μm, dry film125μm

    Coating interval

    Substrate temperature

    5℃

    20℃

    30℃

    The shortest

    48h

    24h

    2h

    The longest

    14d

    7d

    3d

    Surface treatment

    Oxide skin steel

    they shall be conducted the treatment of Shot blasting or Sand blasting ,meeting the Swedish derusting standard Sa2.5 level

    No oxide skin steel

    they can be conducted the treatment of Shot blasting or Sand blasting ,meeting the Swedish derusting standard Sa2.5 level or can be polished by pneumatic and electric tools to meet St2 level

     

    Steel coated with shop primer

    They need to be derusted for second times, the broken shop primer and polluted materials shall be eliminated clean, meeting the Swedish derusting standard St3level

     

    Construction condition

    The substrate temperature must over 3℃ than usual ,relative humidity must over 85%; when constructional substrate temperature is less than 5℃, epoxy and hardener will not be reacted, theconstruction shall be banned.

    Prior primer

    Epoxy zinc-rich shop primer, epoxy zinc powder shop primer, epoxy Rusty red shop primer, inorganic zinc silicate shop primer, and epoxy micaceous iron antirust paint can also be painted directly on the surface of steel which met the antirust quality of Sa2.5 level.

    Finishing paint

    Chlorinated rubber asphalt antirust paint, acrylic antifouling paint, chlorinated rubber long-term antifouling paint, self-polishing long-term antifouling paint, chlorinated rubber high- strength long-term antifouling paint, no tin polishing long-term antifouling paint, etc.

    Packing Specification

    Component A:20 liters containersper20kg components

    Component B: 5 liters containersper 4kg components

    Considerations

    *Temperature>30℃ when respray with the paint film stuck on hand, the effect of respray is best.

    *If in the excess of the biggest respray interval or coating paint, operators shall polish the surface of previous pass paint film first, and coat in order to keep the adhesion within layers.

    Safety guide

    *Avoiding inhalation of vapor or mist, skin and eyes shall not be contacted with this product. In the process of construction, the forced ventilation shall be provided especially in the place which is in narrow and stagnant air condition. The protective gear shall be provided in the execution of construction.

    Annotation

    *Above-said thickness of dry film and wet film refers to the index while implementing the high-pressure air-free spray;

    *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it;

    *If above data is changed, the data is based on the latest instruction, without prior notification.

     

Tags: