Product Description
The coating is solvent based coating which is can be cured at room temperature and manufactured by grinding and dispersing fluorine olefin ethyl ether copolymer resin and weather resistance paint, and supplemented by a variety of modified components. The film is tough and rapid drying and good at adhesion, weather resistance and salt fog resistance.
Design Purpose
It is used as a finish of high-rise buildings, bridges, offshore platform and all kinds of steel structures.
Physical Parameters | Color: | Various color |
| Luster | Glossy, semi-gloss |
| Theoretical spreading rate | 240g/m2 (calculated by 100μm dry film, excluding loss) |
| Specific gravity: | 1.26-1.37 |
| Drying time | 23±2℃:surface dry: 0.5h, hard dry: 24h |
| Entirely cured | 23±2℃:7d |
| Flash point | 27℃ |
| Storage period | 6 months |
Construction Instruction | Mixing ratio | Component A: Component B=9:1 |
Maturing time | 23±2℃:20mins | |
Service life | 23±2℃:8hs | |
Construction method | High pressure siphon spray and air spray, manual brushing, roller spray and other coating methods. | |
Diluent | X-30 fluorocarbon coating diluent (the amount is commonly 5%-15%). | |
Spray orifice | 0.40-0.50mm | |
Spray pressure | 250kg/cm2 (spraying information are for reference only and can be adjusted when in practice). | |
Tool washing | X-30 fluorocarbon coating diluent | |
Film coating thickness | 170μm for wet film, 100μm for dry film. | |
Coating interval | 23±2℃:minimum 2h, maximum 24h | |
Surface treatment | If the preceding paint has been contaminated, take proper measurements to remove grease, dust, and also diluent for the preceding paint can be used to scrub. | |
Construction condition | Temperature is in 5℃ - 35℃, relative humidity shall be less than 85%, surface temperature of the object to be painted shall greater than dew point above 3℃, construction shall be forbidden under the condition of rain, fog, snow and larger dust. | |
| Prior primer | Zinc-rich epoxy primer, micaceous iron epoxy anti-rusting paint. |
| Maintenance period | 23±2℃:more than 7d. |
Packing Specification | Container of 20 liters can load Component A of 18kg, container of 4 liters can load Component B of 2kg. | |
Remarks | Film thickness can be adjusted according to demand, however, that can correspondingly change spreading rate and affect drying time. | |
Considerations | *If coating time of the preceding paint is too long, when coating the sequent paint, roughen the surface with waterproof abrasive paper, paint the coating after clearing away the dust and dirt on the surface to assure the interlayer adhesion. *Tools for construction shall be clean and dry, the coating shall not be mixed with water or other impurities, prepare the coating at the time of use, and the coating shall be used up in 4h. *Before entirely cured and dry, take protection measurements for the film to avoid the washing and trample from rains or other liquid. *Coatings shall be stored in a dry and ventilated place, kept away from heat source, and avoid direct sunshine and isolated from fire. | |
Safety guide | Please pay attention to the security issues on the packaging. In addition, relevant national safety code or specified by the local government shall be followed. Avoid inhaling solvent vapors and spray mist for long term, skin and eye may not contact with the product. Forced ventilation shall be provided when applying the paint in confined spaces or stagnant air, although in good ventilation, protection tools shall be worn. | |
Annotation | *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it; *If above data is changed, the data is based on the latest instruction, without prior notification. |