  • Product Description

    The product is consisted of acrylic resin, lightfast paint, wear resisting paint, additive, solvent and etc. The products have the characteristics of quick drying of paint film , not easy to turn yellow, wearing resistance of paint film, and etc.


    Design Purpose

    The product is used for coating traffic signs of asphalt and concrete surface.


    Physical Parameters

    Color:

    White   Medium yellow

     

    Luster

    Semi-gloss

     

    Theoretical spreading rate

    175-220g/m2, 5.70m2/L (calculated by 50μm dry, excluding loss)

     

     

    Specific gravity:

    1.00-1.25

     

    Drying time

    23±2℃:surface drying≤2h, actual drying≤8h

     

    Flash point

    25℃

     

    Storage period

    12 months

    Construction Instruction

    Mixing ratio

    Single canned

     

    Maturing time

    Open and stir

     

    Service life

    Unlimit


    Construction method

    High pressure siphon spray,air spray, manual spray, roller spray


    Diluent

    Road marking paint

    special diluent


    Maximal dilution amount

    High pressure siphon spray<5%; air spray<10%; manual spray, roller spray<3%


    Spray orifice

    High pressure siphon spray0.4~0.5mm; air spray2.0~2.5mm


    Spray pressure

    High pressure siphon spray12~15Mpa; air spray0.3~0.5Mpa


    Tool washing

    Road marking paint

    special diluent


    Film coating thickness

    Wet film175μm, dry film75μm


    Coating interval

    Substrate temperature

    0℃

    20℃

    30℃



    The shortest

    24h

    8h

    6h



    The longest

    Unlimit


    Surface treatment

    In the execution of construction, the pavement shall keep dry and clean.


    Construction condition

    The substrate temperature must over 3℃ than usual,relative humidity must over 85%.

    Packing Specification

    20 liters containers can load 20kg components

    Safety guide

    Avoiding inhalation of vapor or mist, skin and eyes shall not be contacted with this product. In the process of construction, the forced ventilation shall be provided especially in the placeundernarrow and stagnant air condition. The protective gear shall be provided in the execution of construction.

    Annotation

    *Above-said thickness of dry film and wet film refers to the index while implementing the high-pressure air-free spray;

    *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it;

    *If above data is changed, the data is based on the latest instruction, without prior notification.